Rehabilitation and Restoration of the Potable Water Supply Network in Aleppo Countryside

The potable water supply network in the Aleppo Countryside has experienced shortages due to a number of reasons. First, Internally Displaced Persons (IDPs) have fled from cities to the countryside, causing an increased demand for water in this area. Secondly, a large number of towns and small cities were disconnected from the central water supply network of the Aleppo governorate. Third, during the conflict, equipment, wells, and pumping stations in the area have been stolen or destroyed. Fourth, even before the conflict, some towns experienced water shortages; wells were drilled to address this issue, but due to the conflict pumping equipment has not been installed. Lastly, two years without general maintenance and repairs has caused the water supply network to further deteriorate.

In order to address these issues, the SRTF will procure equipment required for wells and minor rehabilitation of the distribution networks. This includes pipe fittings, manhole works, control panels, generators, and transformers. Other works to be addressed include:

  • construction of towers and ground tanks (for water storage facilities);
  • installation of a chlorination systems;
  • drilling of boreholes or deepening existing ones;
  • replacing damaged pipes; and,
  • rehabilitation of the administration offices of the implementing entity.

As a result of this project, the following outputs are expected:

  • rehabilitation of water systems in 21 selected communities;
  • rehabilitation of 24 wells by equipping them with submersible pumps; and,
  • rehabilitation of pipes of water distribution and chlorination systems in the Aleppo Countryside.

At the completion of this project, more than 234,000 people in two districts of the Aleppo Countryside will have access to safe, affordable drinking water with direct benefits on health and living conditions. The rehabilitation works shall contribute to an increased access of potable water for 50% of the population to 80%.

It is expected that this project will last approximately 15 months and be completed by January 2016. The finance agreement was signed in late-October 2014.

 

For more information on the project, visit:

The SRTF begins rehabilitation of the potable water supply network in Aleppo Countryside

Staff of SRTF-supported water and sanitation project inside Syria conclude a technical training visit to Türkiye

The SRTF completes part of the construction works in one of its water supply projects in Aleppo countryside

The SRTF Delivers Galvanized Iron Pipes and Control Panels to Rehabilitate Potable Water Network in Aleppo Countryside

The SRTF Delivers Repair Tools for Maintenance of Water Distribution Networks to Aleppo and Idleb Governorates

 

 


This site uses cookies, check the Cookies Policy

Accept